Call us

Terms and conditions

1. Introduction

These are the terms and conditions on which Framemaster (Sabreline Consultants Ltd) (Company No. 04430045) of 10 Solihull Lane, Hall Green, Birmingham, B28 9LU (“we”, “us”, “our”, or the “Company”) supplies goods and services to you (“you” or the “Customer”).

These terms apply to residential customers. If you are contracting in the course of business, different terms may apply.

2. Definitions

  • Contract: the agreement between you and us for the supply of the Goods and/or Services, incorporating these terms and the Order/Quotation.
  • Goods: products supplied by us (e.g., windows, doors, glazing, frames, components) as described in the Quotation/Order.
  • Services: installation and related services we provide.
  • Site: the property address where the work is carried out.
  • Charges/Price: the total price for the Goods/Services as set out in the Quotation/Order, as varied under this Contract.
  • Estimated Start Date / Lead Time: our best estimate of when we expect to start and/or deliver.
  • Variation: any change to the agreed Goods/Services (including specification, measurements, access requirements, or additional works).
  • Practical Completion: the point at which the Works are complete in all material respects and capable of normal use, subject to minor snagging items.

3. The contract

3.1 Our Quotation and these terms form the basis of the Contract once you accept our Order/Quotation in writing (including email/WhatsApp confirmation) and we confirm acceptance.

3.2 If there is any conflict between documents, the order of priority is: (1) your signed/accepted Order/Quotation, (2) any written Variation agreed later, (3) these terms.

3.3 No other terms (including any you propose) apply unless we agree in writing.

4. Price and payment

4.1 Deposits and payment stages: deposits and/or staged payments may be required. The amount of any deposit, the number of stages, the timing of payments, and what triggers each stage will be set out in your Order/Quotation and may vary from contract to contract.

4.2 Unless your Order/Quotation states otherwise, our typical payment stages are:

  • 50% deposit on placing the order (to secure manufacture/materials and scheduling)
  • 40% on arrival of materials / prior to installation commencement (as stated on your Order)
  • 10% on Practical Completion (on the day), before our team leaves site

4.3 We will invoice in line with the payment stages shown on your Order/Quotation. Payment is due within 7 days of invoice unless your invoice states otherwise.

4.4 We may pause manufacture, delivery, or installation if payments are overdue.

4.5 VAT: prices are exclusive of VAT unless stated otherwise.

4.6 Title to Goods passes to you only once all Charges are paid in full. Risk passes on delivery to Site (see clause 8).

5. Surveys and specifications

5.1 Any measurements/specifications taken before a final survey are indicative.

5.2 Final measure survey and manufacture authorisation: where we carry out a final measure survey at the Site, the specification and measurements agreed at that survey form the basis of manufacture. By signing/approving the Order following the final measure survey, you authorise us to place manufacturing orders and procure bespoke Goods to your specification.

5.3 If the final survey identifies changes required to specification, structure, or access, we will notify you and treat changes as a Variation (clause 12).

6. Delivery and installation dates

6.1 Dates for delivery/installation are estimates, not guaranteed dates, unless we agree a fixed date in writing.

6.2 We are not responsible for delays caused by events outside our reasonable control (e.g., supplier delays, extreme weather, illness, access restrictions, structural discoveries, planning/building control issues). We will keep you updated and agree a revised schedule.

6.3 Delay alone is not a right to cancel once Goods are bespoke/manufactured to your specification, unless the delay is significant and we fail to perform within a reasonable time.

7. Access and site preparation

7.1 You must provide safe, clear access to the Site and a suitable working environment (including electricity and water where reasonably required).

7.2 You must tell us before work starts about known hazards (e.g., asbestos, unsafe structures, hidden services). If asbestos is suspected or found, we may stop work until it is made safe by a specialist at your cost.

7.3 We will take reasonable care to protect your home, but some disruption/dust/noise is inevitable.

7.4 Unless expressly included in your Quotation, making good (e.g., redecorating, plastering, tiling, landscaping) and waste removal/skips are not included and remain your responsibility.

8. Risk and ownership

8.1 Risk of loss/damage to Goods passes to you when Goods are delivered to the Site.

8.2 If Goods are stored at the Site before installation, you are responsible for keeping them safe and dry.

8.3 Title remains with us until paid in full. If you do not pay, we may seek to recover Goods where reasonably possible and lawful. We will not enter your home without consent or lawful authority.

9. Your statutory rights

9.1 Nothing in this Contract limits or excludes your statutory rights, including under the Consumer Rights Act 2015.

9.2 We must provide Services with reasonable care and skill, and Goods must be of satisfactory quality, fit for purpose, and as described.

10. Warranties

10.1 Workmanship warranty: we warrant that installation workmanship will be free from material defects for 12 months from Practical Completion, unless your Order states a longer period.

10.2 Manufacturer warranties: where Goods are supplied with a manufacturer’s warranty, we will provide details and (where possible) pass the benefit to you.

10.3 This warranty does not cover:

  • fair wear and tear
  • damage caused by misuse, accidental damage, third-party alterations, or failure to maintain/ventilate as advised
  • defects caused by pre-existing structural issues or movement not caused by our work

10.4 If a defect arises, you must notify us within a reasonable time and allow us reasonable access to inspect and remedy.

11. Glass quality and viewing conditions

11.1 Glass should be inspected in accordance with recognised industry viewing conditions:

  • viewed at right angles from the room side
  • in natural daylight, not direct sunlight
  • from at least 2 metres (or 3 metres for toughened/laminated/coated glass)
  • excluding a 50mm perimeter band

11.2 Minor visual effects and manufacturing phenomena may occur and are not necessarily defects, including:

  • small seeds/bubbles/blisters, fine hairlines, minor embedded particles (not obtrusive)
  • interference patterns, double-pane effect, anisotropy visible through polarised lenses
  • external condensation on high-performance glazing

11.3 Nickel sulphide inclusions: toughened glass can very rarely fail due to nickel sulphide (NiS) inclusions even after testing. This does not affect your statutory rights. Where breakage occurs, we will assess cause and the applicable warranty/coverage.

12. Variations

12.1 Any Variation should be agreed in writing (email/WhatsApp acceptable) before we proceed, including:

  • description of the change
  • price adjustment
  • time/schedule impact

12.2 If urgent work is required for safety or to prevent damage (e.g., unexpected structural issue), we may carry out necessary temporary works and will inform you as soon as reasonably possible.

13. Liability

13.1 We do not exclude liability for death/personal injury caused by our negligence, fraud, or any liability that cannot legally be excluded.

13.2 Subject to 13.1, we are not liable for indirect or consequential losses. Nothing in this clause affects your statutory consumer rights.

14. Cancellation rights

14.1 When cooling-off applies: if this Contract is agreed off-premises (for example, signed at your home) or at a distance (for example, by phone/email/online), you may have a legal right to cancel within 14 days of entering into the Contract.

14.2 Made-to-measure / bespoke goods: you acknowledge and agree that the Goods are made to your specifications and bespoke to your property. Where the Contract is agreed off-premises or at a distance, the statutory 14-day cancellation right does not apply to made-to-measure or clearly personalised goods.

14.3 Final measure survey authorisation: where you sign/approve the Order following the final measure survey, you authorise us to place manufacturing orders and procure bespoke Goods to your specification and measurements.

14.4 Services started within any cancellation period: if you request that we begin Services within any applicable cancellation period, you agree that, if you later cancel (where cancellation rights apply), you will pay for Services supplied up to the date of cancellation.

14.5 No impact on statutory rights: nothing in this clause affects your statutory rights in relation to faulty Goods, Goods not as described, or Services not carried out with reasonable care and skill.

15. Termination and suspension

15.1 We may terminate or suspend performance if you materially breach this Contract (including non-payment) and fail to remedy within a reasonable time after notice.

15.2 If you cancel after bespoke Goods have been ordered/manufactured, you may be liable for costs reasonably incurred up to the cancellation date, subject to your statutory rights.

16. General terms

16.1 Notices must be in writing (email acceptable) to the address/contact details on the Order.

16.2 If any term is unenforceable, the remainder continues in force.

16.3 We are not responsible for failure/delay caused by events outside our reasonable control (force majeure).

16.4 This Contract is governed by the laws of England and Wales and disputes are subject to the courts of England and Wales.